Big Coal Output at Bulger More coal was mined at the Bulger Block Coal Co.'s mine at Bulger in July than during any similar period in the history of the mine. The total output was 25,800 tons and the mine was idle three days besides the Sundays. Leon RANDOUR is superintendent and Thomas JOHNSTON is mine boss. Both are McDonald men and well known for their ability to get results.