Friends, In answer to a request, I will write this note regarding the proposed cost of having GPR/EMC work done in a limited fashion, just a real-time survey intended to locate stones, footstones, bases, or rocks beneath the surface, at the Old Brick cemetery. As a ballpark figure, the cost would be $1,200 per day for the real-time GPR survey work, $200/day per diem for the crew, plus roundtrip/onside mileage. Best wishes, Robert